August 16, 2018 - Finishing the Dash
Except for a change in screw head size, to be the larger of the two sizes shown above, the dash is ready to lock in place. The bulkhead access door has also been placed permanently, and the gas tank installation is nearly complete. The seat bottom has been reattached in preparation for its matching seat back once the gas tank is in place. Much can be accomplished when the Flyer is in its upright position.