July 12, 2018 - The Final Strips are in Place
On July 12, by Noon, the final four strips were bonded to the topside. This is certainly a milestone in construction of the Flyer. The plan for the afternoon was to form the seat back on the cold vacuum press. See these photos next time. For now, the slideshow depicts the progress as of July 12 at Noon.